Trial heats were conducted to determine if raw limestone can be used in the production of steel in an arc furnace. The main
process parameters were recorded and samples of the steel and slag were obtained during the heats. It was determined that
raw limestone can be used in the furnace if there is a shortage of fresh-burnt lime, but the performance indices of the furnace
should be expected to decrease in this case. The decrease in performance will be negligible if the consumption of raw limestone
is limited to 0.8–1 ton/heat.
Key words removal of impurities - reduction in sulfur content - addition of lime - raw limestone