This paper describes a feasibility stage geotechnical evaluation carried out at the Karameh dam site. The 45 m high, 2,150 m
long dam will be built across the Wadi Mallaha on Quaternary lacustrine deposits and store fresh water from the King Abdullah
Canal. A confined highly saline aquifer was identified at a depth of 25 m, the saline groundwater migrating naturally through
the Lisan Formation. Stability analysis of the foundation indicates that the slopes are just stable under dry conditions and
may become unstable under wet conditions. The most important problem is the presence of the active main Jordan Valley Fault
crossing both the dam body and reservoir.
Cet article décrit une étude géotechnique de faisabilité concernant le site de barrage de Karameh. Le barrage de 45 m de
hauteur et 2.150 m de longueur sera construit sur des dépôts lacustres quaternaires de l'oued Mallaha et stockera des eaux
douces apportées par le canal King Abdullah. Une nappe captive de forte salinité a été identifiée à 25 m de profondeur, s'écoulant
naturellement au travers de la formation de Lisan. L'analyse de stabilité de l'ouvrage indique que les pentes du barrage sont
juste stables en conditions sèches et peuvent devenir instables en conditions humides. La faille active de la vallée du Jourdain,
traversant la fondation du barrage et le réservoir constitue le principal problème potentiel.
Karameh dam Wadi Al Mallaha Jordan Valley Lithology Stability analysis
Barrage de Karameh Oued Al Mallaha Vallée du Jourdain Lithologie Analyse de stabilité