For ground freezing and pile-support deep foundation pit of south anchorage of Runyang Bridge, ground freezing made the mechanic
state of foundation pit become complex. According structure character of ground freezing and pile-support deep foundation
pit, and the engineering geological condition of site, the large safe monitoring system was built. This paper introduced engineering
geological condition of site, structure of foundation pit and monitoring system. Analysis the change rule of several kinds
of monitoring data, and the feedback analysis was made based on the construction monitoring, guarantee the safety and stability
of ground freezing and pile-support deep foundation pit of south anchorage. The monitor result indicated the ground freezing
and pile-support method is viable for deep foundation pit, and the experience was backlog for construction of similar engineering
aftertime.